Review time depends on the RCA, road environment, complexity, completeness of the submission and urgency. Contractors should avoid promising start dates until the relevant authority has completed its review.
Plain-English explanation
The key points, split into simple blocks so the page is useful without feeling like a wall of text.
01
Review variables
Review time depends on the RCA, road type, completeness of the submission, work complexity, public transport impacts, state highway interfaces and whether comments need a response. Simple, complete submissions on local roads are usually faster than complex or incomplete ones.
02
Planning backwards from start date
Work backwards from the desired start date and allow time for design, internal checking, RCA review, comments, amendments and contractor mobilisation. Starting the TMP conversation on the day work is planned is a common cause of delay.
03
Urgent work cautions
Urgency does not remove the need for clear information. A complete brief is the fastest useful starting point when time is tight. Authority review pathways still apply, so urgent jobs need accurate, well-organised submissions.
Contractor checklist
Before you request help
Confirm the work location and RCA
Describe the work method and staging
Collect plans, photos and dates
Check pedestrian, cyclist and property access impacts
The relevant council, RCA or network owner reviews the submission. Our role is to help make the information clearer, more complete and easier to respond to.
What do you need before starting?
Send the work location, scope, dates, site plans or markups, methodology, hours of work, access needs, photos if available, and any RCA comments already received.
Can you work with our on-road crew or traffic management provider?
Yes. Your TMP Designer focuses on the planning, documentation and drawing support around the job. If your project also needs on-road setup, equipment or training, we can keep the TMP, CAR/WAP and drawing information aligned while those field services are arranged with the right provider.
From scope to submission
Send the scope. We will tell you what is needed.
Send plans, photos, dates or RCA comments and get practical next steps for TMP design, CAR support, amendments or overflow planning.