Why councils issue RFIs on TMPs

RFIs usually happen when the reviewer cannot see how the TMP matches the work, site, dates, pedestrian effects, access needs, methodology or risk controls.

Why councils issue RFIs on TMPs guide for New Zealand TMP, CAR and road corridor planning

Plain-English explanation

The key points, split into simple blocks so the page is useful without feeling like a wall of text.

01

Common RFI themes

RFIs often focus on missing staging, unclear pedestrian management, dates that do not match, vague work methods, access impacts or drawings that do not reflect the actual site. Each theme points to a place where the reviewer cannot see the link between the work and the controls.

02

How to respond

Respond directly to each comment, update the TMP/TMD where needed and keep version changes clear so the reviewer can see what has changed. A covering note that maps each response to the relevant document page helps reviewers move faster.

03

How to prevent repeats

Keep a simple comment tracker and reuse lessons from previous submissions. Repeated issues usually point to a briefing or template problem. Fixing the briefing process often prevents the same RFI from appearing on the next job.

Contractor checklist

Before you request help

  • Confirm the work location and RCA
  • Describe the work method and staging
  • Collect plans, photos and dates
  • Check pedestrian, cyclist and property access impacts
  • Keep TMP, CAR and WAP details aligned
FAQ

Common questions

Who reviews the TMP or CAR?

The relevant council, RCA or network owner reviews the submission. Our role is to help make the information clearer, more complete and easier to respond to.

What do you need before starting?

Send the work location, scope, dates, site plans or markups, methodology, hours of work, access needs, photos if available, and any RCA comments already received.

Can you work with our on-road crew or traffic management provider?

Yes. Your TMP Designer focuses on the planning, documentation and drawing support around the job. If your project also needs on-road setup, equipment or training, we can keep the TMP, CAR/WAP and drawing information aligned while those field services are arranged with the right provider.

From scope to submission

Send the scope. We will tell you what is needed.

Send plans, photos, dates or RCA comments and get practical next steps for TMP design, CAR support, amendments or overflow planning.