Auckland Transport work needs clear scope, accurate corridor details and practical planning for pedestrians, buses, parking, cyclists, driveways and dense urban traffic.

Answer first

What contractors need to know

For Auckland Transport-controlled road corridor work, contractors should prepare the work location, methodology, dates, staging, TMP/TMD details and any AT comments before lodging or amending a CAR/TMP package.

How Auckland Transport corridor work should be briefed

This guide is designed to help contractors understand what information may be needed before lodging worksite, TMP, CAR or WAP details.

If your job is straightforward, the checklist may be enough to help you prepare. If the work is complex, urgent, staged, near pedestrians, near buses, on a State Highway interface, or already has RCA/TMC comments, specialist TMP/CAR support may save avoidable rework.

We are selective about the work we take on. Clear scope, real dates and proper site information help us provide useful support.

Supported pathways

TMP, CAR, WAP and RCA/TMC support

TMP designCAR supportWAP supportWorksite detailsAmendmentsRCA/TMC commentsState Highway interfaceBus/public transport
Local road environment

Auckland Transport planning notes

Auckland Transport jobs should be planned around the actual road environment rather than copied from a generic TMP template.

Dense urban streets

Auckland work often has limited work space, parking pressure, side roads and nearby property access to manage.

Public transport

Bus lanes, stops and passenger movements can change the TMP controls and review questions.

Pedestrians and cyclists

Footpath, cycleway and crossing impacts need early route planning rather than late markups.

NZGTTM transition

AT's Corridor Access Request page notes a NZGTTM soft launch from 4 May 2026, with CARs assessed using the NZGTTM approach ahead of the full transition on 1 July 2026.

Events and local places

Event, venue and access checks worth doing

Eden Park / Kingsland event days

Eden Park advises that event traffic management plans are usually in place, with surrounding street closures, parking restrictions and access points changing by event.

TMP note: For work near Kingsland, Sandringham Road, Dominion Road or resident parking areas, check event dates before proposing footpath closures, bus layup impacts, lane closures or parking removals.

Eden Park transport information

Go Media Stadium / Penrose event corridor

Go Media Stadium is a major Auckland venue with limited public parking, special event buses or trains for some large events, and neighbour notifications for traffic management plans and event timings.

TMP note: For Penrose works near Beasley Avenue, O'Rorke Road, Church Street, station access or coach routes, check stadium events before finalising work windows and access notes.

Go Media Stadium visitor information

AT major event travel calendar

AT publishes major event travel information for Auckland venues and event locations, including public transport, walking, cycling, driving and parking options.

TMP note: Use the AT event page as a live check before confirming works around Eden Park, Go Media Stadium, Takapuna, waterfront or city-centre event routes.

Auckland Transport event transport

Film, trading and event activity in the road corridor

AT's event and filming CAR pathway covers trading, holding an event or filming within the road corridor, including footpaths and AT assets such as Te Komititanga.

TMP note: Event TMPs should show cyclist, pedestrian, local community, home and business access effects separately from ordinary construction TMP controls.

AT event and filming CAR notes
Work types

Common work types that need clearer planning

high

Footpath and frontage works

Building, utility and reinstatement work where pedestrian access and property access are visible review points.

high

Lane or shoulder closures

Short work fronts or staged works on busy roads where timing and queue impacts need to be clear.

high

Utility works

Trenching, chambers, poles, cabinets and network maintenance with multiple site constraints.

Review issues

Common RCA/TMC issues

TMP not matching the CAR scope

Why it matters: AT reviewers need the work description, dates and location to align.

How we help: We compare the TMP, drawings and CAR details before amendment or submission.

Bus stop or bus lane impacts missed

Why it matters: Public transport impacts can change the required controls and stakeholder checks.

How we help: We flag bus interface questions early and link them back into the work method.

Pedestrian detour unclear

Why it matters: Dense footpaths need practical access routes, not a vague note.

How we help: We turn footpath impacts into clearer staging and drawing notes.

Event or filming pathway missed

Why it matters: AT treats event and filming activity in the road corridor as a specific approval pathway, with MyWorksites submission and AT Events confirmation required before the activity proceeds.

How we help: We separate event/filming access notes from construction worksite notes so the CAR, TMP and affected-party information do not get muddled.

Contractor filter

Use the checklist before contacting us

Prepare these details first

  • AT road name and exact frontage
  • CAR/worksite reference if already started
  • TMP/TMD or marked-up sketch
  • Work dates and hours
  • Pedestrian, bus, parking and driveway impacts
  • Any AT or TMC comments
Official sources

Public RCA links and contacts

Public contact notes

AT Road Corridor Access / Works Coordination: Use AT's Corridor Access Request and Works Coordination pathway. AT's public Works Coordination page says AT specialists may include a Road Corridor Access Coordinator and ATOC Traffic Engineer. No named public RCA/TMC person was published on the checked AT pages. Source

AT event and filming approvals: Submit event or filming road-corridor activity through MyWorksites and wait for AT Events confirmation. AT states event and filming activity in the road corridor needs AT approval, with event submissions selecting Events as the work type and observing the published lead times. Source

Public contact details can change. Always verify with the official RCA/council/NZTA source before relying on them.

Related pages

Useful next pages

FAQ

Auckland Transport TMP/CAR questions

Do I need a TMP for Auckland Transport work?

If the work affects the road corridor, footpath, shoulder, parking, vehicle access, pedestrians, cyclists or traffic movement, prepare to check the TMP, CAR or WAP pathway for Auckland Transport.

Can Your TMP Designer respond to Auckland Transport RCA/TMC comments?

Yes. Send the comment, current TMP/TMD, reference number, dates and updated site information. We review what is being asked and help prepare a clearer response package.

What should I prepare before contacting you?

Prepare the location, dates, work method, plans or photos, affected road users, access impacts and any RCA/TMC comments. Missing information usually slows the first review.

What can you help improve before review?

We help contractors prepare clearer site-specific documentation, align the TMP with CAR/WAP details and respond to reviewer comments. The relevant RCA, council or NZTA reviewer still makes the approval decision.

This page is general contractor guidance only. RCA requirements, systems, contacts and review settings can change. Always verify live requirements with the official RCA, council or NZTA source before relying on them.